Indications and requirements concerning the NS 2019, submitted by the manager of the national railway infrastructure, R.F.I. S.p.A., the NS 2018 and the preparation of the NS 2020
The Authority addressed the IM with indications and requirements concerning, inter alia, infrastructure access conditions and characteristics, capacity allocation, services and the extraordinary update of NS 2018. The Decision further addressed issues concerning the rail corridors and the international capacity booking system.
In particular, the Authority imposed on the IM to identify the Path Coordination System – PCS developed by RNE as the sole instrument for international capacity requests, with the aim of identifying only IT systems capable of ensuring maximum transparency, traceability and equity of the access procedures to the railway network.
Share